Summary of discrepancy between Gd-rCBV and MION-rCBV for each correction scheme permutation
Scheme | rCBV Discrepancy | Intercept | Slope | |||
---|---|---|---|---|---|---|
Mean (%) | 95% CI (%) | Mean | 95% CI | Mean | 95% CI | |
P−C− | −142.8 | −471.5, +186.0 | +1.4 | +1.1, +1.6 | −0.01 | −0.04, +0.02 |
P−C+ | +38.3 | −32.0, +108.6 | +1.3 | +0.8, +1.8 | +0.16 | +0.02, +0.31 |
P+C− | +7.6 | −50.1, +65.9 | +1.0 | +0.5, +1.5 | +0.02 | −0.29, +0.33 |
P+C+ | −1.8 | −22.0, +18.3 | +0.6 | −0.2, +1.4 | +0.58 | +0.17, +1.00 |
Note:—rCBV discrepancy indicates (Gd-rCBV − MION-rCBV) / MION-rCBV (ideal equals zero); intercept and slope, the linear fit of MION-rCBV versus Gd-rCBV (ideal equals zero intercept with unity slope).